Work Health & Safety Management Plan

Work Health & Safety Management Plan

Introduction

1 Roles and Responsibilities

1.1 P6 Projects Company Structure

1.2 Person Conducting a Business or Undertaking (PCBU) Responsibilities

1.3   Person in Control 

1.4 Duty of Supervisors – Reasonable Care

1.5           All Workers and Sub-contractors – Reasonable Care

1.6           Visitors and Others at the workplace – Reasonable Care

2 Managing Risks to Health and Safety

2.1 Hierarchy of Controls

2.2 Review of Control Measures

2.3 Workplace Security

3 Site Rules and Inductions

3.1 General Construction Induction

3.2 Site Specific Induction

3.3 Company Safety Induction

4   Safe Work Method Statements (SWMS)

4.1 Site-specific Safe Work Method Statements

5 Managing the Work Environment

5.1   Tool Box Talks

5.2   Work Schedule

5.3   Environmental Considerations

6   Plant

7    Emergency Plan

8   Reporting & Recording

8.1   Hazards

8.2   Site Specific Inspections & Reporting

7       Emergency Plan

If there is an emergency evacuation situation, a pre-determined alarm (which will be identified in the Site Specific Induction) will sound/be raised and all personnel will assemble at the area nominated during Site Specific Induction to await further instruction for returning to site. Emergency contact details and the evacuation process should be displayed clearly on the site temporary switchboard for all personnel to use and follow in case of an emergency situation.

In the event of Fire/Smoke

DO NOT PANIC

 

1.     Call 000

2.     Activate nearest manual call point if inside building

3.     Do not place yourself at risk – if in doubt evacuate immediately to established evacuation point

4.     Turn off and isolate all gas and electrical equipment in the vicinity of emergency if it is safe to do so. Leave lights on if the incident is not related to an electrical emergency involving lighting.

5.     Do not use lifts or elevators.

6.     Assist and move injured persons and persons in immediate danger.

7.     Attempt to extinguish fire ONLY if safe to do so, using appropriate firefighting equipment. DO NOT USE LIQUID EXTINGUISHERS or HOSE REELS ON ELECTRICAL FIRES.

8.     If First Aid qualified attend to any workers requiring assistance until relevant authorities arrive.

9.     Follow all instructions/directions given by Emergency Personnel, Security Staff and other authorised personnel.

 

P6 Projects will ensure that activities at the workplace are safe and without risks to members of the public at or near the workplace.

Refer to Emergency Contact List and Emergency and Evacuation Information Sheet and Diagram.