Work Health & Safety Management Plan
Work Health & Safety Management Plan
1.1 P6 Projects Company Structure
1.2 Person Conducting a Business or Undertaking (PCBU) Responsibilities
1.3 Person in Control
1.4 Duty of Supervisors – Reasonable Care
1.5 All Workers and Sub-contractors – Reasonable Care
1.6 Visitors and Others at the workplace – Reasonable Care
2 Managing Risks to Health and Safety
2.1 Hierarchy of Controls
2.2 Review of Control Measures
2.3 Workplace Security
3.1 General Construction Induction
3.2 Site Specific Induction
3.3 Company Safety Induction
4 Safe Work Method Statements (SWMS)
4.1 Site-specific Safe Work Method Statements
5 Managing the Work Environment
5.1 Tool Box Talks
5.2 Work Schedule
5.3 Environmental Considerations
8.1 Hazards
8.2 Site Specific Inspections & Reporting
6 Plant
The P6 Projects will comply with any requirements about the plant and ensure that plant is registered where required by the Work Health & Safety Regulation 2011, meets Australian Standards and is safe for the purpose for which it is provided and that it is maintained according to Manufacturer’s Log Book requirements/ specifications.
Workers using the plant must ensure any requirements about its safe use are complied with.
■ Plant and equipment owned by P6 Projects will be inspected regularly and any maintenance or inspection details will be recorded in P6 Projects or Manufacturer’s logbooks held on the machine as required.
■ All hired plant and equipment prior to use will also be checked by the Site Coordinator to ensure that all relevant logbooks containing inspection and maintenance details are available and current and that Engineer’s and other certification is provided where necessary. All hired plant is to be delivered and erected on site, by the hirer, in accordance with the relevant plans, engineer’s specifications and drawings and to a standard acceptable by the Site Coordinator. All hired plant is to include safety equipment where required, log book and all other necessary components, certification and documentation
The items listed in the register shall be inspected, maintained and stored on site throughout the duration of their use and manufacturer’s instructions are to be followed at all times when undertaking work or maintenance with the plant and equipment.
Where the operation of any plant creates a substantial risk or where identified by P6 Projects workers as needed, a specific work procedure will be developed for the use of that item and included in this plan