Elimination: Modify the process method or material to eliminate the hazard completely.
Substitution: Replace the material, substance or process with a less hazardous one.
Isolate: Isolate the hazard from the person by safeguarding or by space or time.
Redesign / Engineering Controls: Redesign or modify the plant or process to reduce or eliminate the risk
Administration: Adjust the exposure time or conditions or process by training, procedure, signs etc.
PPE: Use appropriately designed and properly fitted equipment where other controls are not practicable or are accepted.
Elimination: Modify the process method or material to eliminate the hazard completely.
Substitution: Replace the material, substance or process with a less hazardous one.
Isolate: Isolate the hazard from the person by safeguarding or by space or time.
Redesign / Engineering Controls: Redesign or modify the plant or process to reduce or eliminate the risk
Administration: Adjust the exposure time or conditions or process by training, procedure, signs etc.
PPE: Use appropriately designed and properly fitted equipment where other controls are not practicable or are accepted.